Skip to Main Content
HLR Engineering
  • Professional Services
    • Preliminary Engineering
    • Drainage Engineering
    • Structural Engineering
    • Construction Engineering
    • Design Engineering
    • Traffic Engineering
    • Land Acquisition
    • Land Surveying
    • Environmental Services
    • GIS Services
    • Water/ Wastewater
  • Markets
    • Public Infrastructure
    • Energy
    • Recreation
    • Land Development
    • Education
  • Projects
  • About Us
    • News
    • History
    • Awards
    • Lamac Engineering
  • Our Team
  • Careers
    • Resident Engineer
    • Water/Wastewater Engineer
    • Structural Engineer Manager
    • Civil Engineer (Entry-Level)
    • Civil Engineer Internship (Paid)
  • Contact

Multi-Year Street Improvement Plan and Downtown Streetscape

The Village of Glencoe wanted to provide a 20-year plan to improve 90% of the Village streets. The Village’s residential streets needed improvement to address drainage issues and pavement failures, and the downtown needed a facelift to maintain its vitality.

HLR provided design and construction engineering services for this long-term project. Improvements included widening and reconstruction of existing pavements, PCC and bituminous base courses, curb and gutter, storm sewers, underground stormwater detention, water main, and street lighting. The downtown area was improved with brick pavers, raised planters with stone seat walls, new street lights, and a holiday lighting system for illuminating trees in the central business district.

Scope of Work
  • Topographic survey
  • Plans and bid documents
  • Coordination with the IDOT, Bureau of Local Roads
  • Coordination with residents and business owners

Client

Village of Glencoe

Location

Various locations in Glencoe, Illinois

Construction Cost

$22,000,000

Team

Al Stott, PE
Project Manager

Lane Baseley
Design and Resident Engineer

Ryan Livingston, PE
Construction Inspector

John Sweet, PLS
Survey Lead

Similar Projects
Annual Maintenance Program
Woodstock Square Downtown Streetscape
SEBA Park All-Inclusive Playground

Sign up for the latest updates

  • Professional Services
  • Markets
  • Projects
  • About Us
  • Careers
  • Our Team
  • Contact
  • Useful Links
Elgin

380 Shepard Dr.
Elgin, IL 60123
P: 847.697.6700

Woodridge

6825 Hobson Valley Dr., Unit 302
Woodridge, IL 60517
P: 847.697.6700

Springfield

3085 Stevenson Dr., Ste. 201
Springfield, IL 62703
P: 217.546.3400

Mt. Carmel

323 West 3rd St., P.O. Box 160
Mt. Carmel, IL 62863
P: 618.262.8651

© Copyright 2021 Hampton, Lenzini and Renwick, Inc. All rights reserved.
  • Privacy Policy
  • Sitemap