Skip to Main Content
HLR Engineering
  • Professional Services
    • Preliminary Engineering
    • Drainage Engineering
    • Structural Engineering
    • Construction Engineering
    • Design Engineering
    • Traffic Engineering
    • Land Acquisition
    • Land Surveying
    • Environmental Services
    • GIS Services
    • Water/ Wastewater
  • Markets
    • Public Infrastructure
    • Energy
    • Recreation
    • Land Development
    • Education
  • Projects
  • About Us
    • News
    • History
    • Awards
    • Lamac Engineering
  • Our Team
  • Careers
    • Resident Engineer – Elgin, IL
    • Water/Wastewater Engineer
    • Structural Engineer Manager
    • Civil Engineer (EIT) 3+ Years Experience – Elgin or Crystal Lake, IL
    • Civil Engineer Internship (Paid) – Summer 2022
  • Contact

McLean Boulevard Improvements

The two-lane, 7,000-foot-long stretch of McLean Boulevard between Spring Street and Stearns Road does not have the capacity to safely accommodate the 14,000 vehicles that use it each day. Hampton, Lenzini and Renwick, Inc. (HLR) provided Phase I preliminary engineering and is currently providing Phase II design engineering for the reconstruction and widening of McLean Boulevard to improve safety and mobility.

Working with the Village of South Elgin, HLR is designing following improvements and upgrades:

  • Widening from two lanes to a four-lane divided roadway
  • New curb and gutter
  • New multi-use path added on the east side from Spring Street to North Lancaster and on the west side from North Lancaster Circle to Sterns Road. This path will provide the missing gap in a region-wide path network.
  • New traffic signals at North Lancaster Circle
  • Sound wall on the east side of McLean Boulevard

Construction is expected to start in spring 2022. The road is currently owned and managed by IDOT – upon completion, the road will be transferred to the Village of South Elgin.

Learn how HLR’s preliminary and design engineering departments can help with your roadway improvement projects!

Client

Village of South Elgin

Location

McLean Boulevard between Spring Street and Stearns Road

Similar Projects
Longmeadow Parkway Section A
Longmeadow Parkway (Sec. A)
Kishwaukee Bike Path
LAFO Poplar Ave
LAFO Roadway Improvement Projects

Sign up for the latest updates

  • Professional Services
  • Markets
  • Projects
  • About Us
  • Careers
  • Our Team
  • Contact
  • Useful Links
Elgin

380 Shepard Dr.
Elgin, IL 60123
P: 847.697.6700

Crystal Lake

380 N. Terra Cotta Rd., Unit G
Crystal Lake, IL 60014
P: 847.697.6700

Springfield

3085 Stevenson Dr., Ste. 201
Springfield, IL 62703
P: 217.546.3400

Mt. Carmel

323 West 3rd St., P.O. Box 160
Mt. Carmel, IL 62863
P: 618.262.8651

© Copyright 2022 Hampton, Lenzini and Renwick, Inc. All rights reserved.
  • Privacy Policy
  • Sitemap