Skip to Main Content
HLR Engineering
  • Professional Services
    • Preliminary Engineering
    • Drainage Engineering
    • Structural Engineering
    • Construction Engineering
    • Design Engineering
    • Traffic Engineering
    • Land Acquisition
    • Land Surveying
    • Environmental Services
    • GIS Services
    • Water/ Wastewater
  • Markets
    • Public Infrastructure
    • Energy
    • Recreation
    • Land Development
    • Education
  • Projects
  • About Us
    • Lamac Engineering
    • History
    • Awards
    • News
  • Our Team
  • Careers
    • Resident Engineer
    • Transportation Engineering Leader
    • Water / Wastewater Engineer
    • Structural Engineer Manager
    • Civil Engineer
    • Restoration Crew Leader
    • Internships
  • Contact

Longmeadow Parkway (Sec. A)

The Longmeadow Parkway Bridge Corridor is a $120 million, 5.6-mile roadway and bridge over the Fox River, designed to alleviate traffic congestion in northern Kane County and improve accessibility and mobility in support of economic growth and job creation.

HLR was contracted to provide preliminary engineering services for the entire corridor from Huntley Road to Illinois Route 62 including the ESR addendum, wetland impact evaluations, tree survey, EIS e-evaluation, Section 4(f) de minimis report, IDS, and crash analysis. Our team also prepared the original Phase I Design Report and Addendum that was needed to incorporate geometric design updates from the other sections as well as environmental updates as directed by the FHWA and IDOT. HLR surveyors provided supplemental topographic land survey and prepared plats/legal descriptions for parcels to be acquired for the corridor.

In addition, our team prepared Phase II plans for this section of the proposed corridor which included three separate contracts. The first was a locally-let tree clearing contract to remove all vegetation within the section during threatened bat hibernation. The second was a locally-let roadway project that included the new roadway reconstruction of Longmeadow Parkway from Huntley Road to just west of Randall Road. This rural section included shoulders, bike path, stormwater detention within oversized underground storm sewers, and traffic signal improvements at the Longmeadow/Huntley/Boyer intersection. The third leg was a State-let contract that included reconstruction of the Randall Road intersection including new turn-lane configurations. This urban section also included a drainage collection system, aboveground stormwater detention facility, oversized storm sewers for stormwater detention, traffic signals at the Randall/Longmeadow intersection, fiber-optic traffic interconnect, and bike path.

Scope of Work
  • Prepare and submit design report along with all items necessary for the addendum
  • Prepare tree-clearing contract
  • Roadway improvement plans and bid documents
  • Plats and legal descriptions necessary for right-of-way acquisition

Client

Kane County Division of Transportation

Location

Longmeadow Parkway (Huntley Road to IL Route 62)

Construction Cost

$6,300,000

Team

Randal G. Newkirk, PE
Project Manager

Chris Olcott, PE
Stormwater Engineer

Dirk Yuill
Project Engineer

Al Stott, PE
QC/QA

Jeff Meindl, PE
Traffic Engineer

ReJena Lyon, PE, PLS
Survey Manager

Amy McSwane, PE, PTOE
Phase I Manager

Erica Spolar
Environmental Manager

Karen Kase, PWS
Arborist

Similar Projects
Eldamain Road over the Fox River
159th Street (U.S. 6–IL 7) Reconstruction
143rd Street Reconstruction

Sign up for the latest updates

  • Professional Services
  • Markets
  • Projects
  • About Us
  • Careers
  • Our Team
  • Contact
  • Useful Links
Elgin

380 Shepard Dr.
Elgin, IL 60123
P: 847.697.6700

Woodridge

6825 Hobson Valley Dr., Unit 302
Woodridge, IL 60517
P: 847.697.6700

Springfield

3085 Stevenson Dr., Ste. 201
Springfield, IL 62703
P: 217.546.3400

Mt. Carmel

323 West 3rd St., P.O. Box 160
Mt. Carmel, IL 62863
P: 618.262.8651

© Copyright 2019 Hampton, Lenzini and Renwick, Inc. All rights reserved.
  • Privacy Policy
  • Sitemap